- All legs have to be reported to Tour Reporting System after completion.
- Pay attention to your flight plan. Legs with wrong departure and/or arrival airport will be rejected.
- Provided flight plans have to be followed.
- Report takeoff and landing times in UTC (Zulu) time.
- If you had disconnection(s) during a leg (15-20min maximum allowed) and needed to change callsign, mention it under comments.
- Make sure to report the callsign you used on the flight in the relevant field .
-All reporting should be made within maximum of 1 week. Reports submitted more than 1 week following the flight will be rejected.
- Each leg is only valid after validation by a staff member.
Members that will finish this tour will be awarded the IVAO TR Division Pilot Events Award badge